Wind park Beeskow


New construction: 8 Enercon E 160, 5.56 MW, hub height 166.6 m
Repowering: Dismantling of 7 old Vestas V 80 turbines, including foundations




Services:

  • Access roads and crane sites (length of access road: 4,750 m)
  • Foundation engineering, including soil replacement
  • Cable engineering (length of cable route: 8,625 m)

New and existing substation for grid connection point
Construction start March 2024/ Commissioning February/March 2025

Special:

Less than six months between approval and start of construction.
greenwind was commissioned to manage the construction of the infrastructure for the entire project on behalf of its cooperation partners enercity Erneuerbare GmbH and Alteric Deutschland GmbH.
The wind turbines were erected using hybrid towers, each consisting of 30 concrete segments, an adapter and three steel sections.
Due to the height of the turbines, which is 246.6 m above ground level, day and night marking was required.

Services:

Project development windRealisationTechnical Operations




TO
TOP