Feasibility Study for the Siebeneichen District Heating Network (based on BEW)


Project period: 10/25 – 05/26

In the municipality of Siebeneichen, a local heating network using waste heat from the nearby biogas plant has been in operation for several years. The focus of this feasibility study is to examine the expansion of the network in order to supply as many households as possible. The study follows the methodology of a BEW feasibility study. Among other aspects, the use of locally generated renewable electricity from wind turbines is also being investigated.

Services:

Sector coupling

 


TO
TOP